Leave Your Message

Bale Weight, MOQ and Price per Tonne: How the Numbers Fit Together

2026-11-01

A price per tonne is only a number until it is attached to a verified weight. That is why two quotes for the same goods can look far apart and turn out to be the same offer written by two different people.

Start from the bale, not the tonne

We bale at 20 kg. A tonne is therefore fifty bales, and a 40HQ carrying about 28 tonnes holds roughly 1,400 bales. Those three figures are the arithmetic behind every container quote, and they are worth checking against the packing list before you compare prices.

Ask two questions before you discuss rate:

  • Is the weight net or gross, and what does the tare include?
  • What equipment weighs the bale, and who records it?

A floor scale reading recorded at baling is a different document from a number typed into a quotation.

Where MOQ actually sits

There are two thresholds in this trade and they get confused constantly.

A full container is one 40HQ, about 28 tonnes, and it can carry mixed categories. Clothing, shoes and bags travel together without a problem, as long as the split is written into the order and checked against the packing list at arrival.

Below that, loose bales start at 100 kg. That is the level a boutique or a first-time buyer can work at, and it is a normal order rather than a favour.

Mixed is not the risk. Mixed and undocumented is.

What a per-tonne comparison should contain

Put four columns next to each other: verified net weight, the share of the load that meets your grade, the rate, and who pays for what when a bale misses. A quote with a higher rate and a tighter grade often costs less per sellable kilo than a cheaper quote with a loose definition.

That last column is the one buyers skip, and it is the one that decides the margin.

Terms that are worth settling early

Deposit is 30 per cent, with the balance due before shipment. Stock ships in one day; custom sorting and packing take seven days. Packing is 20 kg per bale, and private-label packing starts from 10 bales.

Trade terms and the port of loading are confirmed on the formal quotation rather than assumed from a chat message. Put the same four columns into the contract, and the negotiation stops being about the headline rate.